A66 - Access and Haul roads
BALFOUR BEATTY CIVIL ENGINEERING LIMITED
The Supplier is required to strip topsoil, including residual vegetation clearance and deposition in Topsoil Storage Areas. Topsoil stockpiles are to be managed by the Subcontractor for the duration of the subcontract works, including spraying and treatment necessary by the Subcontractor to maintain the integrity of the material for re-use. The supplier is required to undertake site clearance, to include but not limited to: Wall removal and set aside for reuse Fence removal and disposal Gate removal and disposal Kerb and drainage removal and disposal Sign post removal and disposal Allowance for removal / cutting of tree root systems and disposal Allowance for hard dig and disposal of arisings
- Category
- Construction work for highways, roads
- CPV code
- 45233100
- Contract start
- 30 November 2026
- Contract end
- 29 November 2029
- Tender deadline
- 5 August 2026
- First published
- 22 July 2026
- Last updated
- 22 July 2026
Organisations on this notice
- BALFOUR BEATTY CIVIL ENGINEERING LIMITED buyer possible match
Source & provenance
Record ID (OCID): ocds-b5fd17-94169d39-39de-447e-94c8-e299cecec469 · CONTRACTS_FINDER